Another important factor in obtaining the Excellent rating was the high energy efficiency of the project. So, as a result of energy modeling the facility received 10 points out of a possible 15. Impressive improvements over the base model of the building were achieved:
✔️ 31.4% less energy consumption;
✔️ 50% less energy consumption;
✔️ 9.8% lower CO2 emissions.
The following factors contributed to the high result: - more efficient interior lighting is applied;
- low thermal conductivity of stained glass windows, doors and gates.
- application of high efficiency rotary recuperators for the ventilation system;
- application of air recirculation at night in the sales area.
Energy modelling at the design stage is an effective solution to justify further construction of a modern and energy efficient building.
Ecosovetnik specialists have extensive experience in conducting such studies using the BRE Global approved software - Energy Plus - please contact us, we will be happy to perform such a study for your building!
#breeam #breeamexcellent #energymodeling